Step 1
Problem
The glove met a high protection level but was too bulky for fine work, so workers removed it during precision tasks and lost the protection at the point of risk.
Step 2
Diagnosis
A single continuous TPR run from the fingers to the back of the hand restricted flexion across the knuckles.
Step 3
Revision / solution
The TPR was divided into three segments from fingers to back of hand, with an overlapping scaled joint structure placed at the knuckles to improve bending.
Step 5
Result
The recorded account states that operators no longer needed to remove the glove during precision work.
Honesty boundary
Limitations
Spoken account only: the country was not recorded, and no calculated accident rate, wear rate, glove-doffing rate or fatigue data was provided. The stated outcome is a field observation, not a measured result.