TPR impact protection · Made to order

TPR impact gloves for mining, oil & gas and heavy industry.

STRATAGRIP supplies PPE brands, importers, industrial safety distributors and end users who have to defend what they put in the field. We start from the glove you are using now — where it fails, how it grips, how its TPR is built — and every published configuration keeps its own recorded specification and evidence status.

Current Glove Evaluation

Send us the glove that is in service now. It is the shortest route to a worked-through answer.

What comes back: a construction review, the failure point we can see, TPR, grip and reinforcement observations, a performance target, the recommended configuration and the sample route. Where the information supplied is not enough to conclude, the answer says which parts are engineering hypotheses rather than test results.

  • Made to order
  • Report reference recorded per model
  • Batch and revision traceability
  • First reply within one business day

Project paths

Start from the job you are actually doing.

Four ways buyers reach us. Each path page states what we need from you, what we do with it, and which decisions it settles.

Path 01 · Replacement

Replace or improve a glove in service

You have a working SKU and it is not holding: TPR lifting or delaminating, wear at the palm or thumb crotch, fit and colour drifting between batches. We work from the glove in use, its failure points and what it has to survive.

Evaluate my current glove

Path 02 · Range

Add one impact SKU

You have a range and a gap in it: one impact model, positioned and specified, without rebuilding the rest of the line. We match it against the applications it has to cover and the positions it has to hold.

Review my SKU requirement

Path 03 · Own brand

Private label impact gloves

Your brand, your packaging, your range: light customisation inside a stated boundary, with the evidence position answered per configuration instead of assumed, and commercial conditions held in one place.

Start a private label project

Path 04 · Development

Bespoke TPR / OEM

Tooling, TPR geometry and development work where the platform is yours to define. Ownership, dormancy and the validation path are agreed before any irrecoverable cost is committed.

Start an OEM development

Not sure which path fits? Start with the glove.

The evaluation takes the glove you are using now and returns the construction review, the failure point, the performance target and the sample route.

Start a Product Evaluation

Who we work with

Built for buyers who answer for the product.

STRATAGRIP works B2B only, and every product we make carries TPR impact protection. Four buyer types decide what this site says and what we develop.

PPE brands with their own catalogue

You sell under your own name, and you need an impact glove that differs in the hand as well as on the shelf, plus repeat production that matches the approved sample and revision.

Importers and distributors

You buy from Asia and sell into a local channel. A stable specification, a SKU set that fits that channel and a second order that arrives like the first matter more than a headline price.

Industrial safety suppliers and MRO

You keep a working range available across many sites. Replenishment, fit within the range you already carry, and margin through the channel decide what stays on the shelf.

Mining, oil & gas and heavy industry end users

You feel it on site: wear at the wear points, grip that goes once the work is oily or wet, cut combined with impact, and the cost of replacing gloves per crew per month.

What brings buyers here

It usually starts with something the current glove is doing wrong.

The trigger is rarely “we need gloves”. It is a failure, a drift between batches, or a number that will not come down.

  • TPR pads lifting, delaminating, or glue sitting proud after a few shifts.
  • Sample approved, bulk different: hand feel, fit, colour or construction moving between batches.
  • A glove that meets its level on paper but is too clumsy in the hand, so the crew stops wearing it.
  • Wear concentrated at the palm, the thumb crotch or the coating, with a replacement cycle that will not stretch.
  • Grip that holds while the work is dry and goes once it turns oily or wet.
  • A level claimed for a configuration nobody can trace back to a report, a revision or the sizes it covers.

Why this supplier

Engineering control you can trace, not claims on a page.

We sell into procurement, so a claim has to survive an audit trail. This is the trail we keep.

Control & traceability

TPR design, production and bonding sit with one dedicated capability, so pad geometry and adhesion are controlled at the source rather than assembled from whatever a subcontractor happens to supply. Sewing and dipping run in controlled units against the approved revision, and more than one approved unit in the network keeps capacity resilient without an uncontrolled switch of manufacturing.

A shipped batch carries an identifier: product code, batch code, size and date code, on the label, polybag, inner box or master carton. Internally the chain runs from customer and PO through product code and revision, production batch, material lot, manufacturing unit and tooling to QA release and shipment. Production complete is not the same as released: a consignment is not released until QA, the required tests, quantity, packaging and documents are confirmed.

A test report is evidence for the configuration it was run on. It is tied to a product code, a revision and a covered configuration, and a change to material, structure or performance triggers an applicability review before that result is quoted again. Where no report exists for a configuration, the record says so, and the configuration states whether its evidence is Field Verified, Lab Verified or Not Verified.

Where the evidence lives

Everything we claim has a page behind it.

Six doors into the same record set: case studies for what changed and what it was measured against; the problem library for failure points, diagnosis and the revision that answered them; insights for engineering reviews of TPR architecture, grip and testing; resources for the documents buyers ask for; standards notes written for the buying side rather than copied from the standard; and the buyer questions we are asked most, each answered with a link to the page that owns the fact.

Latest records

What has been published so far.

Case studies and engineering reviews, read from the site's own records. A case appears here only once it is cleared for publication, and each one states how far its evidence goes.

Start with the glove you are using now.

Send the glove, the site conditions and the failure you are seeing. A submitted evaluation is answered within one business day, and nothing about your project is published without written agreement. MOQ, sample terms, payment and production windows are set out in one place.